Bella Vista Mica 7-Piece Bathroom Package - Living Brass

Price Promise - click to find out more

Brand: Bella Vista

Range: Mica

BV-MICA-PACK7-LVB-WS

Colour
Living Brass
Choose Your Basin Tap Style
Free Delivery Included
Ships free Australia-wide
Lifetime Warranty

Confidence for Life

Every piece is backed by:
• Lifetime Colour Warranty – keeps its finish for life.
• Lifetime Parts or Replacement – we’ll repair or replace, no questions asked.

Download Warranty Information

Need Help?

Can't decide? Give us a call at 03 9304 2612 (Mon-Fri, 9:00am-5:00pm) or email us at sales@bluebathware.com.au and our expert team will help you make the perfect choice for your needs.

Transform your bathroom with this complete Bella Vista Mica package in Living Brass — a finish that's truly one of a kind. Everything you need for a fully coordinated bathroom — tapware, shower, and accessories — all in one convenient purchase.

Living Brass — A Finish That Evolves With You

Unlike standard finishes, Living Brass is bare brass that develops a natural patina over time. Every piece starts the same but ages uniquely — meaning no two bathrooms will ever look identical. Natural colour variations are part of the beauty. This is a made-to-order product, please allow 14 days for production.

Confidence for Life

Every piece in this package is backed by Bella Vista's lifetime warranty:

  • Lifetime Colour Warranty — keeps its finish for life
  • Lifetime Parts or Replacement — we'll repair or replace, no questions asked

What's Always Included

No matter which option you choose, every package comes with:

Shower

The LVB Mica Dual Shower Rail (SKU: DSH-R-1H-LVB) delivers a premium shower experience with a dual rail system built from solid brass in Living Brass finish.

The LVB Mica Shower Mixer (SKU: SHM-5-LVB) gives you smooth, precise control over your shower temperature and flow.

Accessories

The LVB Mica Double Towel Rail 800mm (SKU: 1148D-800-P-LVB) keeps two towels within reach and adds a polished finishing touch to your wall.

The LVB Mica Hand Towel Ring (SKU: 1104-P-LVB) sits neatly beside your basin for a clean, coordinated look.

The LVB Mica Toilet Paper Holder (SKU: 1111-P-LVB) is a small detail that makes a big difference in a well-finished bathroom.

The LVB Mica Robe Hook (SKU: 1153-S-P-LVB) gives you a solid, stylish place to hang your robe or towel.

Choose Your Basin Tap Style

The only thing that changes between packages is the tap on your basin. Pick whichever suits your basin and your bathroom:

Option 1 — Wall-Spout Combo (Straight Spout) The tap comes out of the wall above your basin. Water flows from a straight spout — clean, architectural and perfect for feature basins. Includes everything needed for installation. LVB Mica Wall-Spout Combo - Straight Spout 2P — SKU: WBS-51-2P-LVB

Option 2 — Tall Basin Mixer (Curved Spout) A tall tap that sits on top of your basin bench with a curved spout. Great for vessel basins or deeper basins where you need extra height. LVB Mica Tall Basin Mixer - Curved Spout — SKU: BMC-5-TALL-LVB

Option 3 — Basin Mixer (Curved Spout) A standard tap that sits on your basin bench with a curved spout. The most popular choice for everyday basins — elegant, practical and timeless. LVB Mica Basin Mixer - Curved Spout — SKU: BMC-5-LVB

Option 4 — Wall-Spout Combo + Basin Mixer Have a wall spout for water flow and a separate mixer on the basin to control temperature. The ultimate setup for a feature basin or a designer bathroom. LVB Mica Wall-Spout Combo - Straight Spout 2P — SKU: WBS-51-2P-LVB LVB Mica Basin Mixer - Curved Spout — SKU: BMC-5-LVB

About Bella Vista Mica

The Mica collection is built from solid brass — the same material used in every quality tapware piece worldwide. Solid brass means it won't rust, won't corrode, and is built to last a lifetime. Every piece in this collection carries that promise.

Living Brass Finish

This sophisticated finish mimics bare brass that develops a unique patina over time. Each piece features a one-of-a-kind finish that continues to evolve as it ages — revealing an increasingly eye-catching design. Blending modern sophistication with natural charm, Living Brass adds warmth and character to your bathroom that simply cannot be replicated.

Explore the Bella Vista range – designed with a refined, minimalist aesthetic and built for everyday practicality. Each product is crafted with rigour by Australian engineers in Melbourne and manufactured for lifetime use. This close attention to every stage of the design and production process means Bella Vista products offer superior quality and a longer life – and that’s backed by their warranty guarantee.

  • Living Brass
  • Lead-free and WaterMark / WELS compliant where applicable
  • Lifetime warranty on colour and parts or replacement product
  • Supported by Bella Vista’s local after-sales service

Upgrade your bathroom, kitchen, or laundry with products that feel considered, consistent, and built to last.

We ship with two of Australia’s most reliable carriers: Australia Post and Direct Freight Express.

  • Orders under 5 kg are sent via Australia Post
  • Orders 5 kg and above are shipped with Direct Freight Express

Estimated delivery times

  • Metro areas: 2–7 business days
  • Regional & remote: 5–14 business days

We generally dispatch within 2 working days. Delivery times depend on your location and the carrier selected.

Pickup Option (Melbourne Customers)

Melbourne customers can collect their order directly from our showroom. Please contact us after placing your order so we can arrange this for you.

  • Proudly Aussie owned and operated
  • 30-day return policy
  • Free shipping Australia-wide
  • Fast, reliable delivery Australia-wide
  • 20+ Years’ Industry Experience

FAQ

Yes, Melbourne customers can collect their order directly from our showroom. Please contact us after placing your order so we can arrange this for you.

  • Metro areas: 2–7 business days
  • Regional & remote: 5–14 business days We generally dispatch within 2 working days. Delivery time depends on your location and the carrier selected.

Yes. Most of our products come with a 10-year warranty, and many ranges are backed by a lifetime warranty. The exact coverage depends on the product type and range. You can find full warranty details on each product page or by contacting our team.

  • Change of mind: Returns accepted within 30 days, provided items are unused, uninstalled, and in original packaging.
    Return shipping costs are the customer’s responsibility. Refunds are processed back to the original payment method within 3–5 business days.
  • Faulty items: If your order is faulty, we’ll cover the cost of return freight.

Yes. Online Store credit can be issued for eligible returns and is valid for six months.